Skip to contents

Uses Gram-Charlier Series-A distribution approximation to determine the lognormal UPL.

Usage

Lognormal_UPL(data, future_runs = 3, significance = 0.99)

Arguments

data

Emissions data from either the best source or top performers, must have a column named emissions

future_runs

Integer of future runs to use in prediction, the default is 3 since compliance uses 1 test average of 3 runs.

significance

Level of significance from 0 to 1, the default is 0.99.

Value

Upper predictive limit at significance level for the average of the number of future test runs

References

"An upper prediction limit for the arithmetic mean of a lognormal random variable" authored by Dulal Kumar Bhaumik and Robert David Gibbons 2004